Add Additional Columns

  1. From the Standard Grid view, select the Column Chooser icon to open a pop-up window where you can search for and select columns.

  2. In the selected columns list on the right, highlight all columns. To do this, select the first item in the list, press and hold the Shift key, scroll down the list, and select the last item in the list. Then, select the left pointing arrow.

  3. In the Available columns list on the left, type a column name in the search bar or use the scroll bar to find a column by name. Select a column from the Available columns list.

    A yellow caution icon shows when a column is unavailable.
  4. Select the right facing arrow.

  5. Repeat steps three and four as needed for your project.

  6. Click Save.